Interior to Lower Mainland (ILM) Hydro Transmission Project

  • Location – Fraser Valley & Lower Mainland, BC
  • Owner - Flatiron-Graham Joint Venture (for BC Hydro)
  • Description – construction of access roads and storm drainage systems for Section 4 (Stave Lake to Hope) and Section 5 (Coquitlam to Stave Lake) of the transmission line right-of-way
  • Schedule – completion Fall 2013