The Cottages on Osoyoos Lake – Site preparation & servicing

 

  • Location – Osoyoos, BC (2450 Inkaneep Rd. Oliver, BC)
  • Owner – Stelkia Limited Partnership
  • Description – Residential & vacation subdivision site preparation, involving: earthworks, road construction, building pad prep, sediment and erosion control, utility work, asphalt paving, curbing, streetlights and hydro/tel
  • Schedule – December 2011 to August 2012
  • To learn more about this development, please contact The Cottages on Osoyoos Lake at:
    1.855.742.5555

Lower Sumas Mountain Road – Slope repair

  • Location – Sumas Mountain (Abbotsford), BC
  • Owner - City of Abbotsford
  • Description – With environmental consideration of Kilgard Creek, repair of failed roadway slope, including: piledriving, soil anchoring and shotcrete application, retaining walls, roadworks and structural walkway construction
  • Schedule – October to December 2011

Highway 9 & Old Yale Road – Soundwall Construction

 

  • Location – Rosedale, BC near Chilliwack
  • Owner – Ministry of Transportation (MOT)
  • Description – design, supply and installation of precast concrete soundwall, complete with earthworks, wall foundations, and related works
  • Schedule – August to October, 2011

Horn Creek Bank Stabilization

  • Location – Horn Creek, Abbotsford BC
  • Owner – City of Abbotsford
  • Description – stabilization of eroded creek banks with rip-rap and gabion installation, creek bed re-alignment and water control, re-vegetation and landscaping
  • Environmentally-sensitive considerations - full-time monitoring by an environmental engineer to ensure conformation to related ecological measures and specifications
  • Schedule – completed September 2011

Rosegarden Estates Phase 4

 

  • Location – Rosegarden Estates Subdivision, Chilliwack East
  • Project Owner – Ken Burroughs
  • Description – residential subdivision, site preparation and servicing, including roadworks, storm drainage, water supply, asphalt paving, sidewalk installation, street lighting and hydro/tel underground servicing
  • Schedule - completion December 2011