Archive for the ‘Active Road Construction’
Lower Sumas Mountain Road – Slope repair


- Location – Sumas Mountain (Abbotsford), BC
- Owner - City of Abbotsford
- Description – With environmental consideration of Kilgard Creek, repair of failed roadway slope, including: piledriving, soil anchoring and shotcrete application, retaining walls, roadworks and structural walkway construction
- Schedule – October to December 2011
Hatzic Slough Bridge Deck Replacement


- Location – Hwy 7 near Mission BC
- Project Owner – Ministry of Transportation
- Description – replacement of failing timber bridge decking with precast concrete decking, complete with structural steel installation, road work, rip-rap installation and asphalt paving
- Other – environmentally-sensitive considerations regarding the Hatzic Slough
- Schedule – completed November 2011
Active Projects
Completed Projects