Archive for the ‘Completed Earthworks’


Kilgard Creek Drainage Improvements

  • Location – Sumas Mountain, Abbotsford BC
  • Project Owner – City of Abbotsford
  • Description – Replacement of failing pipe culvert with a 2400 x 1800 pre-cast box culvert, complete with earthworks, retaining walls and road works
  • Additional considerations were environmental protection, creek diversion and in-stream works under the direction of environmental consultant
  • Schedule – completed August 2011

Abbotsford International Airport Blast Deflector

  • Location – Abbotsford, BC
  • Project Owner – City of Abbotsford / Abbotsford International Airport
  • Description – Supply and installation of a jet-blast deflector, to accommodate aircraft engine checking, complete with earthworks, concrete footings and electrical work
  • Schedule - completed July 2011

Kent Institution – Maximum Security Housing Unit – Site Preparation

  • Location – Agassiz, BC
  • Project Owner – Public Works & Government Services Canada
  • Description – Site preparation and associated site works for a new maximum security housing unit, containing 96 cells
  • Schedule – completion March 2011 – test

University of the Fraser Valley Ring-Road Construction

  • Location – Abbotsford, BC
  • Project Owner – University of the Fraser Valley
  • Description – Construction of a road way and parking lot to streamline on-campus vehicle traffic management, involving: land clearing, earth works, road construction, utilities, asphalt paving, curbing, sidewalks, streetlighting and landscaping
  • Schedule – completed September 2010

Abbotsford Visitor Information Centre

  • Location – Sumas Way, Abbotsford BC
  • Project Owner – City of Abbotsford
  • Description – Construction of new visitor centre parking lot, involving: earthworks, utilities, asphalt paving, curbing, sidewalks and landscaping
  • Schedule – completed June 2010

Promontory Sidewalks, Chilliwack BC

  • Location – Promontory Mountain, Chilliwack BC
  • Project Owner – City of Chilliwack
  • Description – Walkway and sidewalk construction to accommodate safer pedestrian and student access between GW Graham School and the Promontory subdivision, involving: land clearing, earthworks, retaining walls, asphalt paving, curbing, sidewalks and streetlights
  • Schedule – completed December 2010

Abbotsford International Airport Taxi-way & Apron Expansion

  • Location – Abbotsford, BC
  • Project Owner – City of Abbotsford / Abbotsford International Airport
  • Description – Construction of a 3 km parallel taxi-way and 1.5 km widened apron as part of the airport’s capacity management initiative, involving: site grading, gravel layering, storm drainage, water main installation, asphalt paving, electrical work (apron & taxi-way lighting system) and landscaping
  • In addition to the original contract, Jakes Construction completed a 1 km apron rehabilitation and additional asphalt paved infrastructure to accommodate aircraft engine checking
  • Schedule (main contract) – completed January 2011
  • Schedule (additional work) – completed August 2011

Nanaimo Airport Runway & Taxi-way Extensions

  • Location – Nanaimo, BC
  • Description - Nanaimo Airport runway & taxi-way extensions
  • Scope of work – Site grading, gravel layering, storm drainage, asphalt paving, electrical work (runway lighting system installation)
  • Schedule - February 2009 through December 2009
  • Project owner – Nanaimo Airport Commission
  • Engineering – McElhanney Consulting Services Ltd.

Berry Park Detention System

  • Location – Central Abbotsford
  • Description – Playing field site preparation, involving: pre-loading, sub-grade work, storm detention system and storm sewer installation
  • Completion – Fall 2008

Kanaka Industrial Site Preparation

  • Location – Maple Ridge
  • Project Owner – The Van Maren Group
  • Description – Transformation of depleted gravel pit into an industrial development park, involving: land clearing, gravel excavation, road construction, building pad prep, storm drainage, water main installation, sediment and erosion control
  • Schedule – completed April 2010