Kilgard Creek Drainage Improvements

  • Location – Sumas Mountain, Abbotsford BC
  • Project Owner – City of Abbotsford
  • Description – Replacement of failing pipe culvert with a 2400 x 1800 pre-cast box culvert, complete with earthworks, retaining walls and road works
  • Additional considerations were environmental protection, creek diversion and in-stream works under the direction of environmental consultant
  • Schedule – completed August 2011

Abbotsford International Airport Blast Deflector

  • Location – Abbotsford, BC
  • Project Owner – City of Abbotsford / Abbotsford International Airport
  • Description – Supply and installation of a jet-blast deflector, to accommodate aircraft engine checking, complete with earthworks, concrete footings and electrical work
  • Schedule - completed July 2011

Highway 9, Miami River Bridge Upgrade

Location – Miami River Bridge crossing, Hwy 9, Harrison Hot Springs, BC

Description – Replacement of existing degraded steel culvert with a new concrete bridge.

Scope – Demolition, in-stream work, pile driving, concrete including precast girders, roadwork, utilities and environmental mitigation

Schedule – Complete – now open to traffic

Owner – Ministry of Transportation & Infrastructure

Nathan Creek Culvert Replacement

Before

After

Location: Northwest Abbotsford

Description: Replacement of existing degraded concrete culvert with two sets of new concrete box culverts

Scope of work: Land clearing, excavation, demolition, culvert supply and installation, embankment fill, retaining walls, roadwork, asphalt paving, creek control, environmental work

Schedule: August 2008 through October 2008

Owner: City of Abbotsford