Archive for the ‘Completed Utility Construction’
University of the Fraser Valley Ring-Road Construction

- Location – Abbotsford, BC
- Project Owner – University of the Fraser Valley
- Description – Construction of a road way and parking lot to streamline on-campus vehicle traffic management, involving: land clearing, earth works, road construction, utilities, asphalt paving, curbing, sidewalks, streetlighting and landscaping
- Schedule – completed September 2010
Abbotsford Visitor Information Centre

- Location – Sumas Way, Abbotsford BC
- Project Owner – City of Abbotsford
- Description – Construction of new visitor centre parking lot, involving: earthworks, utilities, asphalt paving, curbing, sidewalks and landscaping
- Schedule – completed June 2010
Abbotsford International Airport Taxi-way & Apron Expansion


- Location – Abbotsford, BC
- Project Owner – City of Abbotsford / Abbotsford International Airport
- Description – Construction of a 3 km parallel taxi-way and 1.5 km widened apron as part of the airport’s capacity management initiative, involving: site grading, gravel layering, storm drainage, water main installation, asphalt paving, electrical work (apron & taxi-way lighting system) and landscaping
- In addition to the original contract, Jakes Construction completed a 1 km apron rehabilitation and additional asphalt paved infrastructure to accommodate aircraft engine checking
- Schedule (main contract) – completed January 2011
- Schedule (additional work) – completed August 2011
Aldergrove Sanitary Sewer, Phase 3

- Location – Township of Langley, 264th St., 33rd Ave. and 32nd Ave., between Robertson Crescent and 272nd St
- Description – Installation of 3.2 kilometres of 600mm diameter PVC sanitary forcemain
- Project Owner – Township of Langley
- Scope – Trench excavation, pipe installation complete with fittings and valves, culvert installation, riparian work, road restoration
- Schedule – completed December 2010
Nixon Allan Road Off-site Servicing

- Location – East Chilliwack, The Falls area
- Description – Two-lane access road that leads to a future residential development area, involving: road construction, utility installation and retaining wall installation
- Schedule – restart Spring ’09, completed Fall ’09
Berry Park Detention System

- Location – Central Abbotsford
- Description – Playing field site preparation, involving: pre-loading, sub-grade work, storm detention system and storm sewer installation
- Completion – Fall 2008
Regal Peak Estates, Site Preparation & Utilities

- Location – Eagle Mountain, Abbotsford
- Project Owner – Sumas Peak Developments
- Description – Residential subdivision site preparation, involving: land clearing, excavation, rock blasting, road construction, building pad prep, storm drainage, sediment and erosion control, utility work, asphalt paving, curbing & sidewalks, streetlights, hydro/tel
- Schedule – completed summer 2010
Active Projects
Completed Projects