The Cottages on Osoyoos Lake – Site preparation & servicing
January 20th, 2012


- Location – Osoyoos, BC (2450 Inkaneep Rd. Oliver, BC)
- Owner – Stelkia Limited Partnership
- Description – Residential & vacation subdivision site preparation, involving: earthworks, road construction, building pad prep, sediment and erosion control, utility work, asphalt paving, curbing, streetlights and hydro/tel
- Schedule – December 2011 to August 2012
- To learn more about this development, please contact The Cottages on Osoyoos Lake at:
1.855.742.5555
Lower Sumas Mountain Road – Slope repair
January 20th, 2012


- Location – Sumas Mountain (Abbotsford), BC
- Owner - City of Abbotsford
- Description – With environmental consideration of Kilgard Creek, repair of failed roadway slope, including: piledriving, soil anchoring and shotcrete application, retaining walls, roadworks and structural walkway construction
- Schedule – October to December 2011
Highway 9 & Old Yale Road – Soundwall Construction
January 13th, 2012


- Location – Rosedale, BC near Chilliwack
- Owner – Ministry of Transportation (MOT)
- Description – design, supply and installation of precast concrete soundwall, complete with earthworks, wall foundations, and related works
- Schedule – August to October, 2011
Horn Creek Bank Stabilization
November 25th, 2011


- Location – Horn Creek, Abbotsford BC
- Owner – City of Abbotsford
- Description – stabilization of eroded creek banks with rip-rap and gabion installation, creek bed re-alignment and water control, re-vegetation and landscaping
- Environmentally-sensitive considerations - full-time monitoring by an environmental engineer to ensure conformation to related ecological measures and specifications
- Schedule – completed September 2011
Hatzic Slough Bridge Deck Replacement
November 25th, 2011


- Location – Hwy 7 near Mission BC
- Project Owner – Ministry of Transportation
- Description – replacement of failing timber bridge decking with precast concrete decking, complete with structural steel installation, road work, rip-rap installation and asphalt paving
- Other – environmentally-sensitive considerations regarding the Hatzic Slough
- Schedule – completed November 2011
Rosegarden Estates Phase 4
November 10th, 2011


- Location – Rosegarden Estates Subdivision, Chilliwack East
- Project Owner – Ken Burroughs
- Description – residential subdivision, site preparation and servicing, including roadworks, storm drainage, water supply, asphalt paving, sidewalk installation, street lighting and hydro/tel underground servicing
- Schedule - completion December 2011
Abbotsford Airport Floodlight Installation
November 10th, 2011

- Location – Abbotsford International Airport (YXX), Abbotsford BC
- Project Owner – City of Abbotsford
- Description – Installation of 4 owner-supplied airport apron floodlights, 22 metres high, complete with earthworks, concrete footings, electrical and site restoration work
- Schedule – completed July 2011