University of the Fraser Valley Ring-Road Construction

  • Location – Abbotsford, BC
  • Project Owner - University of the Fraser Valley
  • Description – Construction of a road way and parking lot to streamline on-campus vehicle traffic management, involving: land clearing, earth works, road construction, utilities, asphalt paving, curbing, sidewalks, streetlighting and landscaping
  • Schedule – completion July 2010

Abbotsford Visitor Information Centre

  • Location – Sumas Way, Abbotsford BC
  • Project Owner - City of Abbotsford
  • Description – Construction of new visitor centre parking lot, involving: earthworks, utilities, asphalt paving, curbing, sidewalks and landscaping
  • Schedule – completion June 2010

Promontory Sidewalks, Chilliwack BC

  • Location – Promontory Mountain, Chilliwack BC
  • Project Owner - City of Chilliwack
  • Description – Walkway and sidewalk construction to accommodate safer pedestrian and student access between GW Graham School and the Promontory subdivision, involving: land clearing, earthworks, retaining walls, asphalt paving, curbing, sidewalks and streetlights
  • Schedule – completion July 2010

Abbotsford International Airport Taxi-way & Apron Expansion

  • Location – Abbotsford, BC
  • Project Owner - City of Abbotsford / Abbotsford International Airport
  • Description – Construction of a 3 km parallel taxi-way (orange) and 1.5 km widened apron (blue) as part of the airport’s capacity management initiative, involving: site grading, gravel layering, storm drainage, water main installation, asphalt paving, electrical work (apron & taxi-way lighting system) and landscaping
  • Schedule – completion January 2011

Aldergrove Sanitary Sewer, Phase 3

 

  • Location - Township of Langley, 264th St., 33rd Ave. and 32nd Ave., between Robertson Crescent and 272nd St
  • Description - Installation of 3.2 kilometres of 600mm diameter PVC sanitary forcemain
  • Project Owner - Township of Langley
  • Scope - Trench excavation, pipe installation complete with fittings and valves, culvert installation, riparian work, road restoration
  • Schedule - August 2009 to May, 2010

Goodbrand Drive Strata Development

  • Location – Goodbrand Drive, Eagle Mountain, Abbotsford
  • Project owner - 110 Enterprises
  • Description – Residential subdivision site preparation, involving: land clearing, excavation, rock blasting, road construction, building pad prep, storm drainage, sediment and erosion control
  • Schedule - completion Summer 2010

Regal Peak Estates, Site Preparation & Utilities

  • Location – Eagle Mountain, Abbotsford
  • Project Owner - Sumas Peak Developments
  • Description – Residential subdivision site preparation, involving: land clearing, excavation, rock blasting, road construction, building pad prep, storm drainage, sediment and erosion control, utility work, asphalt paving, curbing & sidewalks, streetlights, hydro/tel
  • Schedule - completion Summer 2010

Forest Gate Homes Subdivision

  • Location – East Chilliwack, The Falls hillside
  • Description – 44 Lot residential subdivision involving: road construction, utility installation, asphalt paving, curbing and sidewalks, street-lighting and underground duct work
  • Schedule – 2010 completion