University of the Fraser Valley Ring-Road Construction
May 19th, 2010

- Location – Abbotsford, BC
- Project Owner - University of the Fraser Valley
- Description – Construction of a road way and parking lot to streamline on-campus vehicle traffic management, involving: land clearing, earth works, road construction, utilities, asphalt paving, curbing, sidewalks, streetlighting and landscaping
- Schedule – completion July 2010
Abbotsford Visitor Information Centre
May 19th, 2010

- Location – Sumas Way, Abbotsford BC
- Project Owner - City of Abbotsford
- Description – Construction of new visitor centre parking lot, involving: earthworks, utilities, asphalt paving, curbing, sidewalks and landscaping
- Schedule – completion June 2010
Promontory Sidewalks, Chilliwack BC
May 19th, 2010

- Location – Promontory Mountain, Chilliwack BC
- Project Owner - City of Chilliwack
- Description – Walkway and sidewalk construction to accommodate safer pedestrian and student access between GW Graham School and the Promontory subdivision, involving: land clearing, earthworks, retaining walls, asphalt paving, curbing, sidewalks and streetlights
- Schedule – completion July 2010
Abbotsford International Airport Taxi-way & Apron Expansion
May 19th, 2010


- Location – Abbotsford, BC
- Project Owner - City of Abbotsford / Abbotsford International Airport
- Description – Construction of a 3 km parallel taxi-way (orange) and 1.5 km widened apron (blue) as part of the airport’s capacity management initiative, involving: site grading, gravel layering, storm drainage, water main installation, asphalt paving, electrical work (apron & taxi-way lighting system) and landscaping
- Schedule – completion January 2011
Aldergrove Sanitary Sewer, Phase 3
September 11th, 2009

- Location - Township of Langley, 264th St., 33rd Ave. and 32nd Ave., between Robertson Crescent and 272nd St
- Description - Installation of 3.2 kilometres of 600mm diameter PVC sanitary forcemain
- Project Owner - Township of Langley
- Scope - Trench excavation, pipe installation complete with fittings and valves, culvert installation, riparian work, road restoration
- Schedule - August 2009 to May, 2010
Goodbrand Drive Strata Development
August 5th, 2008

- Location – Goodbrand Drive, Eagle Mountain, Abbotsford
- Project owner - 110 Enterprises
- Description – Residential subdivision site preparation, involving: land clearing, excavation, rock blasting, road construction, building pad prep, storm drainage, sediment and erosion control
- Schedule - completion Summer 2010
Regal Peak Estates, Site Preparation & Utilities
August 5th, 2008

- Location – Eagle Mountain, Abbotsford
- Project Owner - Sumas Peak Developments
- Description – Residential subdivision site preparation, involving: land clearing, excavation, rock blasting, road construction, building pad prep, storm drainage, sediment and erosion control, utility work, asphalt paving, curbing & sidewalks, streetlights, hydro/tel
- Schedule - completion Summer 2010
Forest Gate Homes Subdivision
August 5th, 2008

- Location – East Chilliwack, The Falls hillside
- Description – 44 Lot residential subdivision involving: road construction, utility installation, asphalt paving, curbing and sidewalks, street-lighting and underground duct work
- Schedule – 2010 completion
Active Projects
Completed Projects