Abbotsford International Airport Taxi-way & Apron Expansion

Construction of a 3 km parallel taxi-way and 1.5 km widened apron as part of the airport’s capacity management initiative, involving: site grading, gravel layering, storm drainage, water main installation, asphalt paving, electrical work (apron & taxi-way lighting system) and landscaping
In addition to the original contract, Jakes Construction completed a 1 km apron rehabilitation and additional asphalt paved infrastructure to accommodate aircraft engine checking