Chilliwack 2019 Design Build Project

Improvements to road- and utility infrastructure at various locations in Chilliwack, including:

  • Prest – Chilliwack Central roundabout
  • Five Corners intersection
  • Hack Brown road construction
  • Three sidewalks projects.

Work includes

  • Installation of utilities
  • Construction of roadworks with curbing, sidewalks and asphalt paving
  • Upgrades to streetlights and intersection signalization
  • Upgrades and additions to drainage culverts