Highway 1 & Mount Lehman Truck Climbing Lane

Addition of a third lane to the existing 2-lane westbound highway. The existing slow lane will become a truck climbing lane to assist vehicles in negotiating the hill climb. The new lane will be in the median to the left of the existing fast lane.

Scope of work
Land clearing, topsoil stripping, excavation and embankment fill, road layer works, asphalt paving, storm drainage work, retaining walls, traffic control