Lorenzetta Creek Run-of-River Project

Construction of 3.5 km of 600 mm diameter HDPE and steel penstock, complete with:

  • clearing and grubbing
  • access road construction
  • rock blasting
  • anchor drilling
  • trenching and pipe installation
  • welding and coating