Lower Similkameen Water System Upgrade
  • Water supply to the Band administration building
  • Works included construction of 1.6 km of 200 mm diameter HDPE water transmission main, complete with an augered highway crossing, valve chambers and connections
  • Installation of new mechanical and electrical components for the new water treatment building
  • Installation of a water supply well pump, including related pipework and electrical connections