Vedder River Gravel Extraction
  • The project is part of the City of Chilliwack’s flood mitigation program which involves proactively removing accumulated gravel deposits from the Vedder River and Canal
  • Work included: removal of 55,000m3 of sand and gravel from six separate locations along the river, construction of access to gravel bars, excavation and gravel removal, hauling of gravel to stockpile areas and gravel bar restoration
  • The project was monitored by an environmental engineer to ensure a high standard of compliance was met