Chilliwack 2019 Design Build Project
Improvements to road- and utility infrastructure at various locations in Chilliwack, including:
- Prest – Chilliwack Central roundabout
- Five Corners intersection
- Hack Brown road construction
- Three sidewalks projects.
Work includes
- Installation of utilities
- Construction of roadworks with curbing, sidewalks and asphalt paving
- Upgrades to streetlights and intersection signalization
- Upgrades and additions to drainage culverts