Lower Similkameen Water System Upgrade
- Water supply to the Band administration building
- Works included construction of 1.6 km of 200 mm diameter HDPE water transmission main, complete with an augered highway crossing, valve chambers and connections
- Installation of new mechanical and electrical components for the new water treatment building
- Installation of a water supply well pump, including related pipework and electrical connections